Torre Luz Mazatlan

Project

Centro de Distribución Samsung

Industrial warehouse of sheet metal roof with 28,000 m² of construction.

  • Built 2017
  • Client: Conace
  • Location: Parque Industrial El Florido, Tijuana
  • Images courtesy of KR Ingeniería
obra de torre luz superior
Torre luz en Mazatlan
Torre luz Mazatlan
Torre luz Mazatlan
CTA